3.6 MTPA FLNG
2.4 MTPA FLNG
1.3 MTPA FLNG
Standardized design, shortening project schedule and reducing costs
Capacity of standardized design: 0.65/1.2/2.4/3.6/4.5/6.0 MTPA
Fast monetization of natural gas resource
Applied Chart technology
Re-deployable
Nearshore use of dock or pile mooring systems
Deepwater use of single point mooring systems, usable in Metocean conditions of HS=4m:
Soft steel arm mooring for water depths of 20-50m
Tower-based mooring for 50-500m water depth